From Design to Done in as little as 6 months

The first step in our process is to determine which of our ADU offerings is right for you. To do this we:

1: Have a 15 minute discovery call to learn more about your project and answer any questions you may have

2: Perform a site assessment at your property to determine the best location for your ADU and how to connect utilities

3. Provide you with a site assessment package and updated proposal

Design

Site-Built ADUs
1: Select a style, floor plan, and initial finishes
2: Meet with our design team to finalize your design
3: Receive a custom 3D model for review & approval
4: Receive an updated proposal based on the final design
Duration: 2-6 weeks

Prefab ADUs
1: Choose a model
2. Configure your ADU online
3. Select additional customizations (optional)
4. Receive an updated proposal based on the final design
Duration: 1-2 days

Permitting

Sit back and relax, while our team handles all aspects of the permitting process including:

  • Architectural drawing creation
  • Permit application preparation & submittal
  • Building plan revisions & application resubmission
  • Manage communications with municipality

Duration: 3-4 months

ADU Building Process
Adu Process

Construction

Site-Built ADUs
1: Site preparation, foundation, framing
2: Rough-in work (plumbing, electrical, HVAC)
3: Interior and exterior finishing, connect utilities
4: Finishing touches and inspection
Duration: 4-6 months

Prefab ADUs
1: Fabricate unit at factory
2. Site preparation, foundation, prepare utility connects
3. Delivery and crane installation
4. Finishing touches and inspection
Duration: 4-6 months

Enjoy Your ADU

Now the fun begins! Whether you plan to host a family, rent it out, work in it, or live in it, your Nestadu ADU is ready to go!

Our ADUs are designed and built to last a lifetime and will become a valued member of your family.